Nine sunplus systems is iso 9001 and iso13485 certified.
Modular operating room design.
This design is unique to opritech.
Our modular operating theaters are easy to install and move and are able to be installed in as little as 3 5 days in comparison to a traditional operating theater that takes 25 30 days.
In a lot of projects both new buildings and renovations modular operation rooms are used to secure a short controlled and precise building process.
Designed for your success.
We offer turnkey engineering solutions for modular operating rooms which includes site survey design.
Design especially for the construction of modular operating theatres system and modular associated support facilities system.
We not only offer ot design but also offer all materials and components needed including the cleanroom enclosure ot equipment and devices stainless steel.
The functionality of the room has to be spotless as well as the cleanliness.
The system meets the highest requirements for sanitation easy cleaning and disinfection.
Modular operating theatres the construction is done with readymade prefab panels with speedy construction and high quality finishes and flexible to future expansions maintenance without interrupting other functioning departments.
The key point for a real modular room is to use prefabricated partitions that can be simply mounted and dismounted many times on site without losing their mechanical strength and resistance.
Modular rooms building a hospital is a complex task to do and especially operating rooms can be a challenge.